55 Gallon Steel Barrel Production Line

FOB Reference Price:Get Latest Price
$3,000.00 - $8,000.00 / Set | 1 Set/Sets (Min. Order)
Model Number:
55 Gallon Steel Barrel Production Line
Shipping:
Support Sea freight
Lead Time:
Quantity(Sets) 1 - 1 >1
Est. Time(days) 80 Negotiable
Report Suspicious Activity
Overview
Quick Details
Type:
Packaging Line
Condition:
New
Application:
Machinery & Hardware
Packaging Type:
Barrel
Packaging Material:
Metal, Wood
Automatic Grade:
Semi-automatic
Driven Type:
gas
Voltage:
220V/380V
Power:
20KW
Place of Origin:
Shaanxi, China
Brand Name:
200l Steel Barrel Production
Dimension(L*W*H):
L1340*W1580*H1950mm
Weight:
5000kg
Certification:
CE Certification
Product name:
55 Gallon Steel Barrel Production Line
Warranty:
12 Months
Capacity:
55 gallon or 216 L
Keywords:
55 Gallon Steel Barrel Production Line
voltage:
380V
Usage:
steel drum making plant
color:
one color or multi color
thickness:
0.6-1.4mm
steel cover:
2 closures
control system:
PLC
After-sales Service Provided:
Engineers available to service machinery overseas
Supply Ability
Supply Ability:
30 Set/Sets per Month
Packaging & Delivery
Packaging Details
Standard seaworthy package for steel drum production line
Port
main port, in china
Lead Time :
Quantity(Sets) 1 - 1 >1
Est. Time(days) 80 To be negotiated
Product Description

Rolling machine for steel drum production line

A. Rounding machine:

The rounding machine is 3 rollers type , driven by motor, the radius adjustable, special guide plate is equipped to make the steel plate two ends of the edge minimum. Unit power: 2.2 KW;

Auto welding machine:

B、Auto welding machine:

To connect the rounded drums body along the direction of the body, to weld by sewing welding machine, manual operate. power: 150KVA;

Extrusion flange and Beading machine:

The machine put the drum body to insert the forming mold plate, move front and back together to form the flange directly;at same time making the beading.. Flange precision is perfect, working more efficiency, it is proper to use for cold rolling steel plate, PLC control, hydraulic driving. Unit power: 22KW.

Corrugating

The machine put the drum body to insert the forming mold plate, move front and back together to form the flange directly;At same time making the beading.. Flange precision is perfect, working more efficiency, it is proper to use for cold rolling steel plate, PLC control, hydraulic driving. Unit power:22 KW.

Seaming machine:

To put the drum top 、bottom on the loading stand by manual, with drum body auto load press and seam the drums. Double motors and two main shafts running, this is new type construction in this field, drive the seam machine.
The seam machine roll wheels are driven by hydraulic, easy to adjust, PLC controlled, unit power 41KW.

Leakage testing machine:

horizontal type test, air press 0.03Mpa. Manual spray the soap water, manual test the leakage. There are two type of test leakage machines, one is PLC control, hydraulic driving, another is simple, normal control, pneumatic testing machine


Washing line for steel drum production line

(1) Rain spray channel: please read the form of wash equipment technology processes;
(2) Wash transportation

Type: The drums transported go ahead and rotated itself
Speed: 0.5-4m/min.
Motor: Electric-mange.no step/class to adjust speed;
Material:Chain---304 stainless steel or others;
Wheel shaft---2Cr13 stainless steel;


Painting equipments:

(1)Painting room

(2) Paint type: drums vertical;
(3) Out paint color and colors ribbon:

A、Color: The drum cover, bottom, two-end of drum body is in one color; Middle of the drum body is in one color.
B、Colors ribbon: Two colors connect side is clean, and mixture side is less than ±1mm, paint fog spot is allowed but out of 1000mm with un-visible.
(4) PLC control box: 1 set; ( to control the paint and transport)


Drying line for steel drum production line

Heat method:burning oil to heat;
Heat machine unit:2 sets (main part is made in Italy);
Oil consume:80L/h (2 sets)Max;
Work temperature:room temperature to 200ºC, and can be continue to be adjustable;
Temperature control precision:±5 ºC (action precision);
Rising temperature time:≤20min.(When room 20 ºC)
Heat preservation property:when 200ºC in the channel, the surface rising temperature less than 10ºC (local part less than 15ºC);

Packing & Delivery
FAQ

Steel drum production line

Q: How do you ensure quality?
A: we have a strong design & technical team, Our team ensures the production process at every stage and our QC will inspect each procedure as well. we can design and manufacture as your requirements.
Q: How to get an accurate quotation ?
A: Please provide us the detail of the workpiece such as drawings or daily out put
Q: What's the shipping cost from China to your country ?
A: We can send machine to your port by sea . Customers specify freight forwarders or negotiable shipping methods.
Q: Payment terms, MOQ, warranty, FOB...
A: Payment terms: 30% down payment against order
Delivery time: 3 months after receipt of formal order
Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc. You can contact us any time.